Multi-month,
comprehensive
painting projects.
Whole-house repaints. New construction. Phased commercial work. Anything that needs one crew, on one accountability line, for three months or longer. This is what we do better than anyone in Park City.

We are there from framing through final coat. Months on one site, one crew, one standard.
One crew, one trim color, every room.
On a multi-month repaint, the worst thing you can do is hand the job to a rotating cast of subcontractors. One week the trim is bone, the next week it's egg-white, and by month three the powder room looks like a different house. We work it the other way. One crew, one trim spec, the same color memory in the same heads for the whole project. Color continuity is the deliverable.
Whole-house repaints from 1,800 sf condos to 9,000 sf mountain residences.
Built with the builder.
When a custom home is being built, we slot in early. We're there for drywall prime, then we're back for cabinets, then trim, then exterior weather window, then final punch. The GC doesn't have to manage us like a separate trade. We manage ourselves, communicate when conditions slip, and stay out of the other trades' way until they're done.
Active partnerships with Park City and Heber-area custom-home builders.
40-year project calendars.
A 4-month whole-home repaint is not 4 months of nonstop painting. It's a sequence: prep → primers → ceilings → walls → cabinets → trim → exterior weather window → final touch-ups. We map the sequence with you up front, so you know when a room is unusable, when it's safe again, and when the next phase needs your decisions. No mystery. No surprise.
Project calendars sent before the first can opens.
What four months actually looks like.
We send a written sequence like this before we open the first can. Yours will be specific to your home, your timeline, and the season. This is the shape of a typical interior + exterior whole-home repaint.
- Week 1-2Walk-through, color, prep planTest patches in your actual light, written spec sheet, scope sign-off.
- Week 2-4Prep, repairs, primingSand, patch, caulk, prime. The boring half of the work that makes the rest look easy.
- Month 2-3Interior wall + ceiling coatsRoom by room. We move out of one before we open the next.
- Month 3-4Cabinets, trim, doors, woodworkThe detail work. Sprayed where it should be sprayed, brushed where it should be brushed.
- Weather windowExteriorPark City weather is the boss. We schedule the exterior phase around it, not against it.
- Final weekPunch list + walk-outYou walk the house with us. Anything that's not right gets fixed before we leave.
Multi-month project questions.
Anything that runs longer than a few weeks and needs one crew holding the whole thing together. Whole-house repaints, new construction from drywall through punch, phased commercial work, big restorations. If the timeline is measured in months instead of days, this is the page for you.
Got a long one in front of you?
Send the scope. We'll tell you whether we're the right crew and what a realistic calendar looks like.